Skip to content
Tech Interview Prep

Real Interview Questions for the Cloud Architect at Microsoft

New

Practice MCQs

Answers count toward the Cloud Architect and overall leaderboards; your latest answer to each question is the one that counts.

21 questions · Flow follows Relevance until this set has a learning order.

MCQ-1Final round for a Cloud Architect role on the Azure regulated-industries team. The interviewer says the team is measured on customer outcomes rather than features shipped, and that she has already heard the scale, breadth and career-step answers from every candidate this morning; she asks why Microsoft. Your own record: you moved a hospital's estate to Azure and cut clinician login wait from 40 s to 6 s for 12,000 users. Which answer gives her what she is asking for?
MCQ-2At a Microsoft partner you design landing zones; last year that work moved to another region, leaving you 80% pre-sales, and you want design ownership back. You still lead its only FedRAMP landing zone. The reorg is unannounced; your manager wants it kept in the team. The recruiter says the level and band match yours, the team owns landing-zone design for regulated customers, and the interviewer spent six years at your firm. She asks why you are considering new opportunities. Which answer fits?
MCQ-3Microsoft Cloud Architect, final round. The interviewer opens with 'walk me through your CV', then asks which part you were mainly responsible for. Your lead bullet reads 'Migrated 240 workloads to Azure, cut run cost 38% for a 900-person insurer'. You designed the landing zone and the cost model; a partner ran the migration factory; a colleague owned the security baseline. Finance credits 26 of the 38 points to your reserved-instance and idle-shutdown model. Which answer fits?
MCQ-4An AKS cluster runs Azure CNI without Overlay or dynamic IP allocation, `maxPods` 30, in a /23 subnet with 507 usable addresses. It has 12 nodes and 180 running pods; scaling the pool to 20 nodes fails, and the subscription's 400-core quota would only be 80 cores at 20 nodes. Which account of the failure is right?
MCQ-5A claims gateway is a Windows .NET Framework 4.8 service. It must accept a non-HTTP protocol on TCP `8080` from a peered VNet only, and its vendor SDK installs a kernel-mode filter driver and writes to `HKLM` during setup. Secrets must come from Key Vault with no value in deployment config. Which hosting, ingress and secrets combination meets all of that?
MCQ-6A retailer has 500 on-prem VMs in 63 apps and six months. A 45-day flow map shows 9 apps (60 VMs) with no inbound calls or hard-coded IPs, 14 apps (180 VMs) on one Oracle cluster certified in month 4, a pricing app (12 VMs) whose 8 ms path needs a circuit due month 3, 18 apps (150 VMs) with no business owner, and 21 apps (98 VMs) with named owners and no dependencies. Waves move at most 125 VMs; each app's 10-day parallel run is signed off by its business owner. Which VMs go in wave 1?
MCQ-7A manufacturer's CIO opens the design review with 'we modelled this in 2021 and Azure came out 40% dearer; I won't be burned twice.' That model priced VM sizes her region no longer offers, and her own 30-day counters put the SQL tier at 12% average CPU; that tier is 70% of the bill. The datacenter lease renews in 10 weeks and a colo quote is on her desk. Which plan do you put in front of her?
MCQ-8An insurer must host a vendor's fraud-scoring product on Azure. The vendor ships it only as a Windows Server 2022 MSI that installs a kernel-mode filter driver, writes under `HKLM\SYSTEM`, and needs an elevated install; it must run continuously with no cold start. Which Azure target fits?
MCQ-9A bank's regulator requires every packet between its Frankfurt data centre and a West Europe VNet to be encrypted and to stay off the public internet, and the replication job's p95 budget is 15 ms. The DC reaches the VNet over a 10 Gbps ExpressRoute circuit with private peering at 6 ms RTT; its internet line measures 31 ms RTT to the same VNet, and the backup agents on both sides speak only plain TCP. Which design meets all three constraints?
MCQ-10A payments API runs on Azure SQL Database in East US with a failover group to West US; geo-replication lag is 40 s at p99 and the platform alert fires 6 minutes into an outage. The business requires RTO 15 minutes and RPO 5 minutes, proven in a quarterly drill. The failover group's automatic failover policy sits at its 1-hour minimum grace period, and changing the app's connection string needs a 25-minute deployment. Which design meets both targets?
MCQ-11A ticket-scanning service on Azure Cosmos DB for NoSQL takes 60,000 reads/s and 4,000 writes/s from West Europe and East US. Reads must return in 25 ms p95 in both regions and writes issued in either region must commit in 40 ms p95; the two regions are 85 ms apart round trip. Each scanner must read back its own scan immediately, and the account must keep accepting writes through the loss of either region with a 2-minute RTO. Which configuration meets all of that?
MCQ-12A payments API must hold 99.95% monthly availability. Its platform team's contracted figures: App Service in one region 99.95%, zone-redundant 99.99%; Azure SQL single-zone 99.99%, zone-redundant 99.995%. Cost sheet: App Service zone redundancy +$2,400/month, SQL zone redundancy +$1,800/month, a second region +$9,000/month, geo-restore +$300/month. Which single change meets the SLA at the lowest cost?
MCQ-13A federal agency needs a FedRAMP High ATO in six weeks. Its Azure Government workload is 40 IaaS VMs the agency patches, SQL Server 2019 on those VMs configured by agency DBAs, an Azure SQL Managed Instance for the claims app, and a customer-managed key in Key Vault Managed HSM that agency custodians rotate. Which split of inherited and customer-implemented controls belongs in the agency's SSP?
MCQ-14A 9-year-old claims-intake app runs on six Windows Server 2019 VMs and registers a COM component under `HKLM`; the datacenter lease ends in five months. The vendor ships compiled binaries only, with no source and no SDK, under a per-core licence, and its support contract runs to 2029. The app handles 4,000 claims a month and the business has no roadmap to replace it. Which modernization path fits?
MCQ-15A storage account `stassets` in `sub-a` must move to `sub-b`. Both subscriptions are in the same Entra tenant, and `sub-b` is registered for `Microsoft.Storage`. The account carries a `CanNotDelete` lock, and its resource group carries a `ReadOnly` lock. The move fails validation. Which change is required?
MCQ-16A claims platform runs single-zone at 99.95%; zone redundancy costs $4,200/month and lifts the SLA to 99.99%. Finance prices an hour of downtime at $180,000, and the CFO funds a change only if the annual risk reduction, valued from the platform's own 24-month incident record, exceeds the annual cost. That record shows 6.2 hours of unplanned downtime: 4.9 from host and datacenter failures, 1.3 from failed deployments and config pushes. Which sentence belongs in the business case?
MCQ-17A retailer's order service does 1,200 single-row updates a second by order ID, must return a customer's own edit in the same request, and holds a p99 write budget of 15 ms. Analysts run 12 concurrent cohort queries that scan most of the 40 TB five-year ledger and join clickstream Parquet already in ADLS Gen2; dashboards must show a new order within 5 minutes, and finance reconciles the ledger at month-end close. Which storage design fits?
MCQ-18A design-gate review for a bank's landing zone, go-live in three weeks. The customer's lead architect, who holds design-authority sign-off, states that Azure Policy `Deny` assignments do not apply to Bicep deployments from your CI pipeline, and asks for a manual approval step before every deployment. His two platform engineers, who will run the estate, are in the room, and you already have a pipeline run in his sandbox subscription that the deny assignment blocked. What do you do?
MCQ-19Internship, week 2: you present a landing-zone network design; the security lead's 'no PaaS data plane reachable from any network' is read back, agreed, and minuted. Design review runs once, at kickoff; the change process sends a change to review only if it adds a VNet or over $2,000/month. Week 4: an audit-log storage account ships unreviewed; week 6: the quarterly pen test finds its blob endpoint open to all networks. Which account of the breakdown, and which repair, is right?
MCQ-20Final round for a Cloud Architect role at Microsoft. The interviewer asks you to explain cloud computing to a five-year-old, and sets one test: afterwards the child must answer 'if our tablet breaks, is my drawing gone?' correctly. Which explanation passes that test?
MCQ-21Microsoft Cloud Architect final round. She asks for three strengths, three weaknesses, and a time one hurt you and how you counterbalanced it. She has heard 'perfectionist' and 'works too hard' all morning, wants a counterbalance you still run today, and asks about the slipped design review. Your record: on a 14-month bank migration you owned the landing-zone design; its review slipped three weeks because you rewrote a junior architect's network plan instead of reviewing it. Which answer fits?

Curated: · Written: · Reviewed: